Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

How the platform actually works: scheduling, optimization, the shop floor and ERP data.

ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

SAP Scheduling Gaps (And How EDGEBIC Fills Them)

SAP finite capacity scheduling gaps that plants report: infinite-capacity dates, flat work center capacity, sequence-dependent setups, and slow what-if answers.

July 24, 20269 min read
ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

SAP to EDGEBIC: The Data Mapping Reference

SAP data export scheduling field by field: map items, work centers, routings, orders and confirmations into EDGEBIC masks, with conversions and upsert rules.

July 24, 202611 min read
EDGEBIC Platform
EDGEBIC Platform

10 What-If Analysis Mistakes That Produce Confident Wrong Answers

What if analysis mistakes in production scheduling: no baseline, stacked levers, skipped steps that break sequencing, and scenarios nobody made real.

July 24, 20268 min read
EDGEBIC Platform
EDGEBIC Platform

8 Scheduling Run Mistakes That Produce a Plan Nobody Trusts

The production scheduling run mistakes that quietly wreck a plan: wrong scope, stale master data, priorities set too late, and Days Late warnings read as noise.

July 24, 202610 min read
EDGEBIC Platform
EDGEBIC Platform

Eight Setup Matrix Mistakes That Leave Changeover Times Wrong

Setup matrix mistakes in production scheduling: missing family assignments, minutes entered as hours, blank zero cells, and how each one shows up.

July 24, 20269 min read
EDGEBIC Platform
EDGEBIC Platform

Nine Shift and Calendar Setup Mistakes That Quietly Break a Schedule

Shift calendar setup mistakes rarely throw errors: wrong recurring dates, shrunk shifts, per-shift overrides, stale calendars. The symptom and fix for each.

July 24, 20268 min read
ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

The Daily Epicor + EDGEBIC Scheduling Workflow

The daily scheduling workflow Epicor plants run with EDGEBIC: export jobs and labor, re-run saved masks, one finite capacity run, then dates and lists out.

July 24, 20269 min read
ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

The Daily Fourth Shift + EDGEBIC Scheduling Workflow

The daily scheduling workflow Fourth Shift sites run: a weekly load, a twenty-minute morning loop, saved masks, and dispatch lists the floor trusts.

July 24, 20268 min read
ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

The Daily JobBOSS + EDGEBIC Scheduling Workflow

The daily scheduling workflow JobBOSS shops run: morning export, saved import masks, one scheduler run, dispatch lists out, in about twenty minutes.

July 24, 20269 min read
EDGEBIC Platform
EDGEBIC Platform

The Reports That Answer 'Are We On Time?' in EDGEBIC

An on time delivery report for manufacturing is three reports, not one: how EDGEBIC computes late jobs, SPI and CPI, and the on-time trend, with worked numbers.

July 24, 202611 min read
EDGEBIC Platform
EDGEBIC Platform

The Settings That Change How Your Schedule Looks (and the Ones That Change the Plan)

Gantt display settings scheduling teams argue about: which options are cosmetic, which move real work, and the three places the line gets crossed.

July 24, 202610 min read
EDGEBIC Platform
EDGEBIC Platform

TOC Buffers and Direction Precedence in EDGEBIC

How TOC buffer scheduling is sized in EDGEBIC, how backward and forward passes split around the anchor, and which direction wins when several rules could apply.

July 24, 202610 min read
Let's Solve Your Challenges Together