Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

How the platform actually works: scheduling, optimization, the shop floor and ERP data.

EDGEBIC Platform
EDGEBIC Platform

Eight Lot Streaming Configuration Mistakes (and What They Look Like)

Lot streaming configuration mistakes that silently disable operation overlap: batch sizes above order quantity, transit days, and continuous-process flags.

July 24, 20269 min read
EDGEBIC Platform
EDGEBIC Platform

Make to Stock vs Make to Order in EDGEBIC: How the Policy Resolves

Make to stock vs make to order scheduling: how EDGEBIC resolves build policy per order, inflates for yield, and turns product lead time into a delivery tail.

July 24, 202611 min read
Admin & Deployment
Admin & Deployment

Moving EDGEBIC from One Planner to a Shared Server: What Changes, What Carries Over

Going from single user to multi user manufacturing software: the provider switch, what does not migrate with it, and the six habits a shared plan needs.

July 24, 202610 min read
EDGEBIC Platform
EDGEBIC Platform

10 Master Production Schedule Mistakes That Wreck the Build Plan

Master production schedule mistakes that quietly corrupt a build plan: draft orders, half-set product flags, phantom builds, and fences read as locks.

July 24, 20268 min read
EDGEBIC Platform
EDGEBIC Platform

8 Multi-Shift Scheduling Mistakes (and How to Spot Them)

The multi shift scheduling mistakes that break capacity in EDGEBIC: shifts that describe the gross clock, empty shifts, global shift overrides, and six more.

July 24, 20268 min read
ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

NetSuite Scheduling Gaps (And How EDGEBIC Fills Them)

NetSuite finite capacity scheduling gaps manufacturers report: work order dates that ignore capacity, flat work centers, no setup sequencing, slow what-ifs.

July 24, 202610 min read
ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

NetSuite to EDGEBIC: The Data Mapping Reference

NetSuite data export scheduling field by field: map items, work centers, routings, work orders and labor into EDGEBIC masks, with CSV and upsert rules.

July 24, 202611 min read
EDGEBIC Platform
EDGEBIC Platform

Operator and Skill Scheduling Mistakes to Avoid

The operator scheduling mistakes that quietly break a labor-constrained plan: attention left at zero, expired certifications, roster gaps, and unwanted pins.

July 24, 20268 min read
EDGEBIC Platform
EDGEBIC Platform

Schedule Optimizer Mistakes Planners Make

The schedule optimizer mistakes that waste runs in EDGEBIC: misreading no-improvement, fighting locked jobs, optimizing bad data, and judging by one KPI row.

July 24, 20268 min read
EDGEBIC Platform
EDGEBIC Platform

8 Parallel Work Center Configuration Mistakes in EDGEBIC

Parallel work center configuration mistakes that break multi machine scheduling: duplicate shifts, the wrong category, an unread factor, and five more.

July 24, 20268 min read
EDGEBIC Platform
EDGEBIC Platform

Transfer Batch vs Flow Overlap: How EDGEBIC Decides and What Each Costs

Transfer batch vs flow overlap compared with worked numbers: how EDGEBIC picks a lot streaming model, what each gate computes, and the 24% makespan case.

July 24, 202610 min read
EDGEBIC Platform
EDGEBIC Platform

8 Product Master Data Mistakes That Distort Your Schedule

Product master data mistakes and their symptoms: legacy multi-routing rows, padded lead times, unstocked stock items, bad yield values, and cascading deletes.

July 24, 20269 min read
Let's Solve Your Challenges Together