Blog
Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.
How the platform actually works: scheduling, optimization, the shop floor and ERP data.
8 Backward Scheduling Mistakes That Break Just-in-Time Plans
Backward scheduling mistakes that quietly send jobs forward or make them late: missing due dates, late cut off dates, pinned anchors, and wrong lead times.
8 Bottleneck Scheduling Mistakes in EDGEBIC
The bottleneck scheduling mistakes that stop anchor scheduling working: the missing target date, the new-job trap, empty buffers, and five more.
Eight Configuration Mistakes in EDGEBIC (and What They Look Like)
Scheduling software configuration mistakes rarely error out: a policy that never ran, drags that vanish, totals that double. Eight symptoms, real causes.
8 Customer and Department Setup Mistakes in EDGEBIC
Customer credit limit and department mistakes that mislead planners: deleted accounts, stale capacity numbers, and status pills that block nothing.
8 Production Dashboard Mistakes That Send Planners the Wrong Way
Production dashboard mistakes are rarely bad data: the eight ways planners misread the EDGEBIC cockpit, the symptom each shows, and the correct reading.
Department Capacity Analysis in EDGEBIC: How the Numbers Are Built
Department capacity analysis explained: the utilization formula, color thresholds, the plant-wide roll-up, and why the bar is a planning lens not a live load.
7 Routing Dependency Mistakes and the Schedules They Break
Routing dependency mistakes that quietly break a schedule: missing links, one-legged joins, circular chains, repeated machines, and double-counted transit.
Eight Deployment and Database Mistakes in EDGEBIC (and the Fixes)
The manufacturing software deployment mistakes that cost a weekend: an empty database after a provider switch, a password that will not decrypt, no backup.
Shop Floor Actuals Tracking in EDGEBIC: What Gets Captured and Why
Shop floor actuals tracking explained: what an actual is, how kiosk punches and daily grids capture it, and why only run time counts as production hours.
Backward Scheduling in EDGEBIC: Just-in-Time Without the Risk
Backward scheduling means finishing just in time for the due date. See how EDGEBIC right-aligns a job, what beats the setting, and why forward is the safety net.
The Bill of Routing in EDGEBIC: The Recipe Your Schedule Runs On
Bill of routing manufacturing explained: how routing steps, per-unit hours, setup, material rows, and sequence links become the hours on your schedule.
EDGEBIC Configuration Options Explained: What You Can Tune, and Where
Production scheduling software settings split in two: site-wide policy that changes the plan, and display settings that change only your screen. The map.
