Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

How the platform actually works: scheduling, optimization, the shop floor and ERP data.

Outcomes & ROI
Outcomes & ROI

Getting the Floor to Trust the Schedule

Shop floor schedule adoption is earned in the first three weeks, not in training. The six practices that build trust, and the three that quietly destroy it.

July 25, 202610 min read
ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

Global Shop Scheduling Gaps (And How EDGEBIC Fills Them)

Global Shop finite capacity scheduling gaps job shops report: infinite-capacity dates, flat work center capacity, sequence-dependent setups, slow quotes.

July 25, 202610 min read
ERP Integration (EDGEBIC)
ERP Integration (EDGEBIC)

Global Shop to EDGEBIC: The Data Mapping Reference

Global Shop data export scheduling field by field: map items, work centers, routings, jobs and hours into EDGEBIC masks, with conversions and upsert rules.

July 25, 202612 min read
Outcomes & ROI
Outcomes & ROI

Turning Changeover Hours Into Production Hours

Reduce changeover time in manufacturing by scheduling the sequence, not just the jobs. A documented 330-to-90-minute worked case, and the honest limits.

July 25, 20269 min read
Outcomes & ROI
Outcomes & ROI

Where Lead Time Actually Goes, and How to Get It Back

Reduce manufacturing lead time by attacking waiting, not cutting. The four places elapsed time hides, the worked overlap arithmetic, and the honest limits.

July 25, 20269 min read
Outcomes & ROI
Outcomes & ROI

Seeing Next Month's Overload This Month

Manufacturing capacity visibility means knowing which day breaks and why, weeks ahead. The capacity arithmetic, the views that show it, and the honest limits.

July 25, 20269 min read
Outcomes & ROI
Outcomes & ROI

How Finite Capacity Scheduling Improves On-Time Delivery

Improve on time delivery in manufacturing by fixing the promise, not the promise-keeping. The mechanisms, the worked arithmetic, and the honest limits.

July 25, 202610 min read
Outcomes & ROI
Outcomes & ROI

Quoting Dates You Can Actually Hit

Improve quote accuracy in manufacturing by simulating the job against real capacity. The worked cost and date arithmetic, and what a quote still cannot promise.

July 25, 20269 min read
Outcomes & ROI
Outcomes & ROI

Keeping Promises When a Machine Goes Down

Production recovery after machine breakdown depends on rescheduling from what actually happened. The worked arithmetic of one failure, and the honest limits.

July 25, 20269 min read
Outcomes & ROI
Outcomes & ROI

Getting More Out of the Machine That Sets Your Pace

Bottleneck utilization improvement comes from protecting the constraint, not pushing it. Load ratios, the anchor mechanism, and what scheduling cannot fix.

July 25, 20269 min read
Outcomes & ROI
Outcomes & ROI

The End of the Daily Expedite List

Reduce expediting in manufacturing by removing its causes: impossible promises, invisible overloads, and priority that lives in heads instead of the plan.

July 25, 20269 min read
Outcomes & ROI
Outcomes & ROI

When the Schedule Stops Changing Every Morning

Reduce schedule changes in manufacturing with scoped reschedules, preserved actuals, and deferred apply. The mechanisms, the audit trail, the honest limits.

July 25, 20269 min read