Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.
How the platform actually works: scheduling, optimization, the shop floor and ERP data.
What Is a Frozen Window in Scheduling?
A frozen window is a near-term time horizon a reschedule cannot move jobs within. Definition, why it protects the shop floor, and how EDGEBIC preserves it.
What Is a Lot Size Rule in Replenishment Planning?
A lot size rule decides how a replenishment quantity is rounded, from exact shortfall to whole batches. Here is lot-for-lot vs fixed order quantity explained.
What Is a Machine Instance in Scheduling?
A machine instance is one physical machine inside a work center. Learn how the instance count multiplies capacity and lets several jobs run at once.
What Is a Manufacturing Order? Definition and Example
A manufacturing order is a work order to build a specific quantity of a product by a due date. Definition, its lifecycle, a worked example, and how EDGEBIC uses it.
What Is a Margin Bucket in Job Status? EDGEBIC Definition
A schedule-margin bucket sorts each active job into Late, Overdue, On time, or Early by its slack against the due date. See the rules and the EDGEBIC job status donut.
What Is a Master Production Schedule Bucket (MPS Bucket)?
An MPS bucket is a fixed time period that groups demand, supply and build quantities in the master production schedule. Here is how Day, Week and Period buckets work.
What Is a Material Step in a Routing? Definition and Example
A material step consumes a raw material or component at its point in a routing without using work center time. Definition, a worked example, and how EDGEBIC uses it.
What Is a Partial Completion in Scheduling? Definition and Example
A partial completion is a step that ran some but not all of its hours before a reschedule. Definition, the three handling policies, a worked example, and how EDGEBIC uses it.
What Is a Plan Inversion in Scheduling?
A plan inversion is a schedule or booking that ends at or before it starts. Definition, the usual cause in actual-time reporting, and how EDGEBIC flags it.
What Is a Production Schedule? Definition and Example
A production schedule is the engine's dated plan of every operation for a job, bundled with the routing snapshot it was built from. Definition and worked example.
What Is a Reason Code in Production Tracking? Definition and Example
A reason code is a short selectable label that records why a job paused or stalled: machine, material, quality, or waiting. Definition, an example, and how EDGEBIC uses it.
What Is a Replenishment Suggestion in Inventory Planning?
A replenishment suggestion is the system's recommended build quantity when projected stock falls below a trigger. Here is how suggestions are sized and firmed.