Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.
How the platform actually works: scheduling, optimization, the shop floor and ERP data.
Scheduling a Five-Job Week With Mixed Priorities in EDGEBIC
A production scheduling walkthrough: load five jobs with different priorities and due dates, run the scheduler, and read how the engine sequences competing work.
Splitting a Large Order Across Parallel Work Centers in EDGEBIC
A parallel scheduling walkthrough: run one big job on two machines at once, split the hours with load balancing, and finish in roughly half the time.
Standing Up the Kiosk and Logging a First Shift in EDGEBIC
A shop-floor kiosk walkthrough: bring a terminal online, run one operation from setup to complete, count pieces, and hand off the shift with real actuals.
Consume From Stock: How EDGEBIC Nets Demand Against Inventory
Inventory netting production scheduling walkthrough: three orders, 80 units on hand, and how EDGEBIC decides which jobs build and which consume stock.
From Empty Plant to First Schedule: An EDGEBIC Greenfield Walkthrough
Setting up scheduling software from scratch: follow one plant from an empty database to its first committed schedule in EDGEBIC, with every number shown.
Overlapping Operations with Lot Streaming: An EDGEBIC Example
A lot streaming production scheduling example: 1,000 pieces, cut then drill, and how a 100-piece transfer batch lets EDGEBIC save a full day of lead time.
A Machine Breaks at 10 AM: Rescheduling Without Losing the Morning
How to reschedule production after machine breakdown: a walkthrough where logged work stays frozen, the down day is skipped, and the job still ships early.
A Make-to-Stock Replenishment Cycle in EDGEBIC, Step by Step
Make to stock replenishment scheduling walkthrough: a safety-stock breach, a firmed build order, a 4.5-hour press run, and the receipt that restores stock.
The Paint-Booth Math: Sequence-Dependent Changeovers in EDGEBIC
Sequence dependent setup time scheduling, worked in full: six paint jobs, one booth, and how EDGEBIC's setup matrix cuts changeover from 630 to 90 minutes.
Half-Done Is Not Undone: Rescheduling Partially Completed Jobs in EDGEBIC
How to reschedule a partially completed production order: EDGEBIC locks 4 logged hours as history and forward-shifts the remaining 15.2, step by step.
Quote to Ship in EDGEBIC: A Custom Order's Complete Journey
Follow the quote to ship manufacturing process end to end in EDGEBIC: simulation, pricing, conversion, scheduling, shop-floor actuals, and on-time proof.
Scheduling Synchronized Multi-Spindle Operations in EDGEBIC
A synchronized machine scheduling walkthrough: three ganged drill heads start together, finish together, and mirror one parent schedule in EDGEBIC.