Blog
Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.
How the platform actually works: scheduling, optimization, the shop floor and ERP data.
The Data Grid vs the Flow Chart View of a Routing
EDGEBIC gives a routing two views: a data grid for numbers and a flow chart for structure. Learn which to use when, and why they are one routing, not two.
The Planned vs Actual Overlay as a Variance Tool
EDGEBIC keeps plan and reality side by side on every bar, turning the Gantt into a variance tool. See how Applied, Rescheduled, and the hours roll-up expose drift.
Using Timeline Zoom to Plan a Week or a Day
Zoom the EDGEBIC Gantt to match the decision: a month view for capacity, a day view for dispatch. See how timescale, horizon, and Today reshape the schedule view.
What a Visual Schedule Tells a Shop That a List Cannot
A dispatch list says what runs next. A visual schedule shows collisions, ripples, bottlenecks, and plan vs reality at once. See what a shop gains from the picture.
Why a Visual Routing Beats a Spreadsheet BOM
A visual routing shows dependencies, branches, and dead-ends that a spreadsheet BOM hides. See why EDGEBIC draws the factory as a flow chart planners can read.
Drag-and-Drop Rescheduling in EDGEBIC: Modes, Rules, and Ripples
Drag and drop production rescheduling in EDGEBIC: three drag modes, staged saves, downstream flags, and a targeted re-plan that spares the rest of the plant.
The Safety Prompts That Keep Gantt Drags Honest in EDGEBIC
Prevent scheduling errors gantt drag mistakes cause: EDGEBIC's prior-operations prompt, target-date warnings, and hard validations keep manual moves honest.
A Tour of the EDGEBIC Graphical Routing Designer
Tour the graphical routing editor in EDGEBIC: toolbox, canvas, properties panel, connector types, node tooltips, validation, and Excel export, panel by panel.
Editing a Live Job's Routing in EDGEBIC (Safely)
Edit routing on active production order safely: EDGEBIC freezes a per-job routing copy, so you change one live job deliberately and history stays intact.
Making the Gantt Speak: Colors, Labels, and Layouts in EDGEBIC
Gantt chart color coding production teams actually read: EDGEBIC operation states, configurable bar captions with hour tokens, and self-saving layouts.
How to Build a Routing as a Flow Chart in EDGEBIC
Build a manufacturing routing flow chart in EDGEBIC: drag work centers onto a canvas, connect steps with arrows, and schedule straight from the diagram.
Reading the EDGEBIC Gantt: Planned vs Actual at a Glance
Read a planned vs actual Gantt chart in manufacturing: EDGEBIC keeps plan and real dates side by side, so every bar shows plan, reality, and progress.
