Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

How the platform actually works: scheduling, optimization, the shop floor and ERP data.

Featured Guides

Shop Floor Execution
Shop Floor Execution

The Schedule Reconciliation Report in EDGEBIC, Explained

Eight parameter checks over two exception grids. See how EDGEBIC reconciles the plan against the plant and shows only the rows that disagree.

August 19, 20268 min read
Shop Floor Execution
Shop Floor Execution

Why a Dependent-Parallel Child Is Exempt From the Over-Booked Check

Three synchronized drills book 24 hours on an 8 hour day. That is real plant behavior, not a capacity breach, and flagging it would make the whole check useless.

August 19, 20267 min read
Shop Floor Execution
Shop Floor Execution

Confirming a Sub-Assembly Versus the End Product in EDGEBIC

One dialog, two mechanisms. See why confirming an end product reduces the build directly while confirming a sub-assembly works through ordinary stock netting.

August 17, 20267 min read
Shop Floor Execution
Shop Floor Execution

Production Confirmation in EDGEBIC: Report What Is Made, Build the Rest

An order for 100 with 50 already on the pallet should not re-plan 100. See how production confirmation in EDGEBIC reduces the remaining build to the true open quantity.

August 17, 20267 min read
Shop Floor Execution
Shop Floor Execution

Why an End-Product Confirmation Does Not Consume Stock

Reporting produced quantity adds finished goods to stock and takes nothing out. See why EDGEBIC posts a receipt with no matching issue, and what breaks if it did not.

August 17, 20267 min read
Shop Floor Execution
Shop Floor Execution

How Many Kiosk Terminals Does Your Floor Actually Need?

A kiosk session binds to one work center and one machine, not to a person. Learn how that shapes terminal count, siting, and when a shared terminal is the right answer.

August 14, 20268 min read
Shop Floor Execution
Shop Floor Execution

Reading the Job Progress Header as a Supervisor

Five fields answer five different questions about a running job. Learn what job progress percent can and cannot tell you, and the three misreadings that cause trouble.

August 14, 20268 min read
Shop Floor Execution
Shop Floor Execution

Training Your Floor on the Kiosk in One Shift

The terminal has about five taps that matter. Learn the order to teach them in, the three habits that decide whether the data is usable, and what to let operators get wrong.

August 14, 20268 min read
Shop Floor Execution
Shop Floor Execution

What an Over-Estimate Warning on a Step Actually Means

A finished step that used more hours than planned raises a warning on its Actual Live card. Learn the three causes behind it and how to tell which one you are looking at.

August 14, 20268 min read
Shop Floor Execution
Shop Floor Execution

What the Good Counter Actually Counts

Piece counters only increment during a run punch, so parts made during first article and run-off are real, in the bin, and numerically invisible. Why that is correct, and what to reconcile against instead.

August 14, 20267 min read
Shop Floor Execution
Shop Floor Execution

When the Kiosk Queue and the Floor Disagree

The operator sees one job in NEXT UP and the cell is running another. Learn the five reasons that happens, who resolves each, and why the kiosk cannot re-sequence.

August 14, 20268 min read
Shop Floor Execution
Shop Floor Execution

Who May Correct a Kiosk Entry, and When to Escalate

Corrections in EDGEBIC sit on a four-rung ladder from a ten-second undo to a planner reopening a job. Learn which rung fits which mistake and where the line is drawn.

August 14, 20268 min read
Let's Solve Your Challenges Together