Scheduling Concepts
Scheduling Concepts

How the Allocator Fills a Partial First Shift

How EDGEBIC clips the first shift of a job to a mid-shift earliest start, computing usable hours from the start time forward so the first day is never over-allocated.

August 2, 20268 min read
Scheduling Concepts
Scheduling Concepts

Load Leveling Across a Planning Week

Load leveling smooths the peaks and valleys of work across a week so no single day is overloaded. See how a finite scheduler spreads load forward, with worked numbers.

August 2, 20268 min read
Scheduling Concepts
Scheduling Concepts

Protective vs Productive Capacity

Productive capacity makes throughput; protective capacity is deliberate spare on non-bottlenecks that lets the shop recover and keep the constraint fed. See why both matter, with numbers.

August 2, 20268 min read
Scheduling Concepts
Scheduling Concepts

Released vs Unreleased Jobs in Scheduling

A released job is authorized and ready to hit the floor; an unreleased job is planned but held back. See the difference, why it controls work-in-process, and how to manage it.

August 2, 20268 min read
Scheduling Concepts
Scheduling Concepts

Rough-Cut vs Detailed Capacity Planning

Rough-cut capacity planning checks a few key resources against aggregate demand; detailed capacity planning schedules every operation finitely. Compare the two with worked numbers.

August 2, 20268 min read
Scheduling Concepts
Scheduling Concepts

Slack-Based Job Sequencing

Slack-based job sequencing runs the job with the least slack first, where slack is time until due date minus work remaining. See the minimum-slack rule with worked numbers.

August 2, 20268 min read
Scheduling Concepts
Scheduling Concepts

Why a Bottleneck Needs a Target Date to Anchor a Schedule

Why marking a work center as the bottleneck is not enough to trigger anchor scheduling in EDGEBIC, and how a target start date on the constraint step activates it.

August 2, 20268 min read
Scheduling Concepts
Scheduling Concepts

Why Finite Scheduling Shrinks Lead Times

Finite scheduling shrinks lead times by exposing hidden queue, sequencing out idle gaps, and overlapping steps with transfer batches. See the mechanism with worked numbers.

August 2, 20268 min read
Scheduling Concepts
Scheduling Concepts

Why Sequence Matters More Than Speed on a Setup-Heavy Line

On a setup-heavy line, the order you run jobs in beats raw machine speed, because changeover time dominates. See why resequencing can beat a faster machine, with worked numbers.

August 2, 20268 min read
Scheduling Concepts
Scheduling Concepts

Capacity vs Throughput in Manufacturing Scheduling

Capacity is the hours a shop could run; throughput is the good output it actually ships. Here is why the two diverge and why adding capacity off the bottleneck adds nothing.

August 1, 20268 min read
Scheduling Concepts
Scheduling Concepts

How a Plan Absorbs a Late Material Delivery

How a finite capacity plan reflects a late material delivery: model the arrival as a material step or job start, reschedule, and let downstream shift while completed work stays.

August 1, 20268 min read
Scheduling Concepts
Scheduling Concepts

How a Schedule Accounts for Scrap and Yield Loss

If a routing loses parts to scrap, you must start more than you ship. Here is where EDGEBIC inflates the quantity for you, where you size it yourself, and how to get the number right.

August 1, 20268 min read