Blog
Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.
How the platform actually works: scheduling, optimization, the shop floor and ERP data.
Wire and Cable Scheduling With Lot Streaming
Wire and cable production scheduling that overlaps drawing, stranding, and extrusion with transfer batches, so a long multi-stage run does not wait a full lot at every stage.
EDGEBIC for 3D Printing: Scheduling Printer Pools and Long Builds
Additive manufacturing scheduling in EDGEBIC: work center groups pool identical printers, and multi-shift capacity plans the long unattended builds that run overnight.
EDGEBIC for Cosmetics: Batch Scheduling and Changeovers
Cosmetics and personal care batch scheduling in EDGEBIC: sequence fragrance, color, and allergen changeovers to cut sanitation time and keep compounding lines running.
EDGEBIC for Industrial Equipment: Make-to-Order Scheduling
Make-to-order scheduling for industrial equipment in EDGEBIC: backward-schedule from the due date, coordinate multi-level sub-assemblies, and quote honest promise dates.
EDGEBIC for Rubber and Elastomer: Compound Changeovers
Rubber and elastomer production scheduling in EDGEBIC: price compound and color changeovers in a setup matrix and model curing ovens as continuous-process work centers.
EDGEBIC for Semiconductor Scheduling: Recipe Changeovers
Semiconductor production scheduling in EDGEBIC: a sequence-dependent setup matrix prices every recipe changeover on shared tools so lot sequence stops burning capacity.
EDGEBIC for Sheet Metal: Scheduling Around Your Nests
Sheet metal fabrication scheduling in EDGEBIC: sequence nested cut jobs by material and gauge, route across laser and punch machines, and plan the brake bottleneck.
Aerospace Multi-Level Assemblies: Scheduling Sub-Assemblies That Feed the Line
Aerospace multi-level assembly scheduling rolls sub-assembly hours and dependencies up through the routing, so a top-level job waits for the slowest feeder, not a guess.
Chemical Processing: Scheduling Continuous and Batch in One Plan
Chemical processing scheduling that handles both worlds: mark reactors and lines as continuous with an hours-based overlap, and schedule discrete packaging by piece count.
CNC Shops and Operator Skills: When the Setter Is the Constraint
CNC operator skill scheduling models the certified setter as a finite resource, so lights-out cells start on the hours one operator actually has, not machine count.
Consumer Goods: Sequencing Lines to Cut Changeover Waste
Consumer goods changeover sequencing that holds up: price each flavor and scent change per line in a matrix, then let the optimizer order the run to minimize total setup.
Consumer Goods: Scheduling Through a Seasonal Peak
Seasonal capacity scheduling for consumer goods: add a shift, raise a line's hours for a peak week, and let finite-capacity planning show whether the season actually fits.
