Blog

Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

How the platform actually works: scheduling, optimization, the shop floor and ERP data.

EDGEBIC Platform
EDGEBIC Platform

Overlapping Operations When Changeovers Are Sequence-Dependent

The lot streaming setup time interaction in EDGEBIC: piece-count overlap uses the resolved changeover, so resequencing a machine moves every downstream start.

July 25, 202610 min read
EDGEBIC Platform
EDGEBIC Platform

When Machine Pools Meet Parallel Operations

Parallel work centers machine pools resolve in order in EDGEBIC: the pool picks one machine first, then parallel partners attach. What composes, what conflicts.

July 25, 202610 min read
EDGEBIC Platform
EDGEBIC Platform

Bottleneck Scheduling and Due-Date Scheduling in the Same Plan

TOC backward scheduling precedence in EDGEBIC: two different backward passes, opposite triggers, and what happens when one job qualifies for both.

July 25, 202610 min read
EDGEBIC Platform
EDGEBIC Platform

Scheduling Ovens, Baths and Other Continuous-Process Equipment

Continuous process work center scheduling in EDGEBIC: the flag that switches overlap from piece counts to an hour lag, and which equipment truly qualifies.

July 25, 202610 min read
EDGEBIC Platform
EDGEBIC Platform

Deciding What Runs First

Production job priority sequencing in EDGEBIC works in three layers: the dispatch order, the slot strategy inside a machine, and the optimizer's orderings.

July 25, 202610 min read
EDGEBIC Platform
EDGEBIC Platform

Why a Stable Schedule Beats a Perfect One

Production schedule stability in EDGEBIC comes from six mechanisms: immutable actuals, frozen routings, mode blast radius, machine locks and a stability goal.

July 25, 202610 min read
EDGEBIC Platform
EDGEBIC Platform

Scheduling Work That Moves Between Plants

Multi plant production scheduling transit in EDGEBIC: departments, per-machine calendars and routing transit days schedule work that travels between sites.

July 25, 202610 min read
EDGEBIC Platform
EDGEBIC Platform

When to Schedule in Pieces Instead of Hours

Pieces based capacity scheduling in EDGEBIC: how hours, pieces and both differ, when an output rate should override routing hours, and the zero-rate trap.

July 25, 202610 min read
EDGEBIC Platform
EDGEBIC Platform

Scheduling Sub-Assemblies That Feed Several Jobs

Sub assembly scheduling manufacturing in EDGEBIC: one component routing feeding many parents, ordering on shared machines, and the build-to-stock decision.

July 25, 202610 min read
EDGEBIC Platform
EDGEBIC Platform

Eight Production Actuals Mistakes (and the Symptom Each One Produces)

Production actuals mistakes that quietly corrupt a schedule: weekly logging, habitual backfill, sibling edits, unstamped completions, and how to spot each.

July 24, 20268 min read
EDGEBIC Platform
EDGEBIC Platform

Available to Promise in EDGEBIC: The Calculation Behind a Safe Answer

The available to promise calculation tells sales what is still free to sell. Here is how EDGEBIC computes discrete and cumulative ATP, negatives included.

July 24, 202610 min read
EDGEBIC Platform
EDGEBIC Platform

8 Backward Scheduling Mistakes That Break Just-in-Time Plans

Backward scheduling mistakes that quietly send jobs forward or make them late: missing due dates, late cut off dates, pinned anchors, and wrong lead times.

July 24, 202610 min read