Insights on production scheduling, lean manufacturing, and manufacturing software from 35+ years of industry experience.

How the platform actually works: scheduling, optimization, the shop floor and ERP data.

EDGEBIC Platform
EDGEBIC Platform

10 What-If Analysis Mistakes That Produce Confident Wrong Answers

What if analysis mistakes in production scheduling: no baseline, stacked levers, skipped steps that break sequencing, and scenarios nobody made real.

July 24, 20268 min read
EDGEBIC Platform
EDGEBIC Platform

8 Scheduling Run Mistakes That Produce a Plan Nobody Trusts

The production scheduling run mistakes that quietly wreck a plan: wrong scope, stale master data, priorities set too late, and Days Late warnings read as noise.

July 24, 202610 min read
EDGEBIC Platform
EDGEBIC Platform

Eight Setup Matrix Mistakes That Leave Changeover Times Wrong

Setup matrix mistakes in production scheduling: missing family assignments, minutes entered as hours, blank zero cells, and how each one shows up.

July 24, 20269 min read
EDGEBIC Platform
EDGEBIC Platform

Nine Shift and Calendar Setup Mistakes That Quietly Break a Schedule

Shift calendar setup mistakes rarely throw errors: wrong recurring dates, shrunk shifts, per-shift overrides, stale calendars. The symptom and fix for each.

July 24, 20268 min read
EDGEBIC Platform
EDGEBIC Platform

The Reports That Answer 'Are We On Time?' in EDGEBIC

An on time delivery report for manufacturing is three reports, not one: how EDGEBIC computes late jobs, SPI and CPI, and the on-time trend, with worked numbers.

July 24, 202611 min read
EDGEBIC Platform
EDGEBIC Platform

The Settings That Change How Your Schedule Looks (and the Ones That Change the Plan)

Gantt display settings scheduling teams argue about: which options are cosmetic, which move real work, and the three places the line gets crossed.

July 24, 202610 min read
EDGEBIC Platform
EDGEBIC Platform

TOC Buffers and Direction Precedence in EDGEBIC

How TOC buffer scheduling is sized in EDGEBIC, how backward and forward passes split around the anchor, and which direction wins when several rules could apply.

July 24, 202610 min read
EDGEBIC Platform
EDGEBIC Platform

What a Scenario Can and Cannot Change in EDGEBIC

The documented scenario planning limits in manufacturing what-if analysis: which levers a scenario controls, which it never touches, and why.

July 24, 20269 min read
EDGEBIC Platform
EDGEBIC Platform

What the EDGEBIC Schedule Checks Actually Look For

Schedule data quality checks in plain language: over-booking, machine collisions, off-calendar work, consistency drift, and the thresholds behind each finding.

July 24, 202612 min read
EDGEBIC Platform
EDGEBIC Platform

Why Every EDGEBIC Column Carries Its Own Definition

A manufacturing report glossary that cannot drift: how EDGEBIC structures every column definition, validates their links, and what that buys you in an audit.

July 24, 202611 min read
EDGEBIC Platform
EDGEBIC Platform

Routing Version Control for Manufacturing: Snapshot vs Live Routing

Routing version control in manufacturing: how a job's frozen copy is chosen over the live routing, the three authorized writes, and the hybrid merge rules.

July 24, 20269 min read
EDGEBIC Platform
EDGEBIC Platform

Nine Work Center Configuration Mistakes and What They Look Like

Work center configuration mistakes are quiet: wrong instance counts, mixed machine pools, per-machine overrides, stale calendars. The symptom and fix for each.

July 24, 20269 min read