To reset scheduler settings to factory defaults in EDGEBIC by User Solutions, open the Schedule configuration panel in Settings and click Reset to Defaults, then confirm. Every display option returns to its out-of-the-box state and is saved immediately, and the Gantt reloads its work center resources.
This is a display reset, not a scheduling reset. It is the fastest way out of a configuration somebody has experimented into an unreadable state. If your problem is a grid that has lost its columns rather than the scheduler view, see how to restore a default grid layout instead.
Before You Start
- You have the Settings permission. The Settings tab is hidden otherwise.
- You have exported the current configuration if any of it is worth keeping. The reset overwrites and saves in one action with no undo, and an export is one click.
- You understand the scope: this changes how the plan looks, never what the plan says.
Resetting the Configuration
- Open the Settings tab and go to the Schedule configuration panel.
- Scroll to the footer buttons: Reset to Defaults, Import, Export, and Save and Apply Now Configuration.
- If you want a safety net, click Export first and save the file somewhere you can find it.
- Click Reset to Defaults.
- A confirmation asks whether you are sure you want to reset all configuration settings. Click Yes.
There is no separate save step afterward. The reset applies the factory settings to the live view and saves them as your default in the same action.
What the Reset Actually Covers
| Area | Returns to |
|---|---|
| Operation state colors | The factory palette for each schedule state |
| Enabled view types | The default set in the view switcher |
| Bar label patterns | The default operation-description pattern, per work center |
| Drag and update behavior | The out-of-the-box settings |
| Actual-date tracking display | Factory defaults for the overlay and variance colors |
| Work center resources on the Gantt | Reloaded from the current work center list |
| Jobs, dates, capacity, actuals | Nothing. These are not configuration |
| Scheduling policy | Not part of this panel. Policy is separate and site-wide |
That last row matters. The scheduler configuration panel is display and interaction; the scheduling policy that governs how the engine behaves is a different setting and is not touched by this reset. See how to configure scheduling policy if that is what you are actually chasing.
How to Check It Worked
Go back to the Gantt. Bars should be in the standard colors, all the default view types should be selectable in the view switcher, and bar labels should show the default pattern rather than any custom one that was in place.
Run no schedule to check this. If jobs have moved, something other than the reset caused it, because a configuration reset does not re-plan.
Recovering a Configuration You Wanted to Keep
If you reset and then discover the previous settings mattered, you have two routes back, both of which depend on preparation:
- Import a file. If you exported before resetting (or at any earlier point), click Import, pick the file, review the settings, then click Save and Apply Now Configuration to persist them. An imported configuration is not saved to the database until you apply and save it.
- Load a named configuration. If you had previously saved a named configuration, select it from the available configurations list and load it.
If you have neither, the settings are gone and rebuilding by hand is the only option. That is the whole argument for exporting once your configuration is tuned: a reinstall, a new machine, or a colleague's workstation can then import the file instead of re-clicking every option.
A Quick Worked Example
A planner spends an afternoon experimenting with the schedule display: he disables several view types, recolors four operation states, and rewrites the bar-label pattern for two work centers. By Friday the board is unreadable to everyone else at the stand-up.
He opens Settings → Schedule, clicks Export to capture what he built in case one of the color choices was actually good, then clicks Reset to Defaults and confirms. The Gantt reloads in factory colors with every view type back in the switcher and standard bar labels. The following Monday, he reintroduces one change deliberately, changing the Gantt color coding for the single state he genuinely wanted to highlight, and exports again so the plant can share it.
Common Mistakes
Resetting without exporting first. The action overwrites and saves in the same step. Thirty seconds of export saves an afternoon of rebuilding.
Expecting the reset to fix a scheduling problem. If a job is landing in the wrong week, configuration is not the cause. Look at capacity, calendars, and the routing instead.
Assuming the reset is plant-wide. Scheduler configuration is per user. Resetting your view does not fix a colleague's, and their custom colors are still theirs.
Confusing this with the Clear Data tool. The main toolbar's reset button opens the Clear Data Tables dialog, which permanently removes rows. That is a different, destructive action. Read the dialog title before you confirm anything: a display reset never asks you to type a confirmation word.
Forgetting to apply after an import. An imported configuration sits in the panel until you click Save and Apply Now Configuration. Close the panel first and it is lost.
Next Steps
If you want to keep several display setups rather than always returning to factory, how to save a named scheduler configuration is the better habit, and how to change what a Gantt bar label shows covers the setting people most often break. For the full task library, see the EDGEBIC how-to hub, and for the platform overview, EDGEBIC.
Expert Q&A: Deep Dive
Q: A planner turned off several Gantt view types and changed half the operation-state colors while experimenting, and now nobody can read the board. Do we have to redo forty settings by hand?
A: No. Click Reset to Defaults in the Schedule configuration panel and confirm. Every display option returns to factory state in one action, including the view-type checkboxes and the operation-state colors, and the Gantt reloads its resources. If your site had a tuned configuration that took real work to build, load it from a saved named configuration or import the exported file afterward rather than re-clicking. That is exactly the situation exporting once protects you from.
Q: We reset the configuration and now our custom bar labels are gone across the whole plant. Did the reset affect everyone?
A: The scheduler configuration is stored per user, so a reset on one machine returns that user's view to defaults rather than the whole plant's. If colleagues are also seeing default bar labels, either they reset separately or they never had the custom pattern in the first place, because display configuration does not propagate automatically. Rebuild the pattern once, export it, and have each person import it so the plant reads the same board without anyone re-clicking forty options.
Frequently Asked Questions
Ready to Transform Your Production Scheduling?
User Solutions has been helping manufacturers optimize their production schedules for over 35 years. One-time license, 5-day implementation.

User Solutions Team
Manufacturing Software Experts
User Solutions has been developing production planning and scheduling software for manufacturers since 1991. Our team combines 35+ years of manufacturing software expertise with deep industry knowledge to help factories optimize their operations.
Share this article
Related Articles
How to Create a Watched-File Integration in EDGEBIC
Create a watched-file integration in EDGEBIC: point it at the file your ERP drops, pick the target entity and import mask, set the debounce, and let a new file trigger the run.
How to Rehearse an Integration With the EDGEBIC Simulator
Use the built-in Simulator to provision demo data, watch real integration runs happen, and prove the mechanism before you point anything at a live ERP. Includes the tear-down rule.
How to Run an Integration Now and Pause All Schedules in EDGEBIC
Force one integration to run with Run Now, cancel a run in progress, disable a single definition, or tick Pause all schedules to stop every automatic sync for the session.