A where-is-my-order call should cost 30 seconds at a desk, and in most plants it costs three interruptions and a callback, because the only person who knows is standing at a machine. EDGEBIC by User Solutions keeps the answer in the plan: Sales Order Progress rolls a whole customer order into one view, Job Progress snapshots percent complete for every job, and Work Center Progress names the step that is behind. The customer service rep answers while the customer is still on the phone.
This post covers the status-inquiry outcome. It sits under the EDGEBIC results guide. For running the report itself, see how to run the sales order progress report.
What a Status Call Costs Today
The customer asks a simple question. Here is the path it takes in a plant without a progress record:
- The rep does not know, and says they will check.
- The rep calls or walks to the supervisor.
- The supervisor does not know precisely and goes to look.
- An operator is interrupted mid-setup to confirm.
- The supervisor reports back.
- The rep calls the customer a second time.
Six steps, three people, and two customer contacts for one question. Multiply by twenty inquiries a week and the floor time alone is around three and a half hours, arriving in fragments at exactly the moments interruptions are most expensive.
The second contact is the part customers notice. "I will find out and call you back" reads as a shop that does not know what it is doing, even when the answer, once found, is perfectly good news.
Three Reports, Three Grains
The status question comes in three sizes, and each has its own report.
| The question | Report | What it gives |
|---|---|---|
| How is my whole order doing? | Sales Order Progress | The customer's order rolled up |
| How far along is that job? | Job Progress | Percent complete, one row per job, no date range |
| Which step is behind? | Work Center Progress | Step-grain detail under the job |
Job Progress is the workhorse and it carries one rule worth knowing before you quote it to a customer: a job reads Completed only when every operation step has an actual end date. Marking one early step complete does not flip the job, and the finish date stays empty until the last step is done.
Percent complete is hours-first, actual hours divided by planned hours, falling back to pieces only when no hours exist. That keeps the number honest. A job showing 92 percent with one operation untouched is genuinely not finished, and a system that rounded it to done would be setting up a conversation nobody wants to have on the ship date.
From "Where Is It" to "Why, and When"
The better version of the call answers the follow-up before it is asked. Four lookups get you there:
Late Jobs shows how late a job is, ranked, with a blocker hint on the row.
Work Center Progress, filtered to that job, names the operation that stalled and shows hours logged against hours planned on it.
Reschedule History shows whether the job was moved, by how much, and on which run.
Work Center Utilization, with its backlog drill-down, shows whether the station holding it is overloaded and which jobs are ahead of it.
Together those produce a sentence you can actually say: the mill operation has 41 of 101 hours logged with nothing added in three days, the job was pushed four days on Thursday's run, and the mill is running above 100 percent with two rush jobs inserted ahead of it. That is a cause and a plan. It replaces an apology, and it takes about ten minutes rather than two days. See the EDGEBIC report catalog for how the families fit together.
The Arithmetic
For a plant handling twenty status inquiries a week:
| Before | After | |
|---|---|---|
| Floor interruptions per inquiry | 2 | 0 |
| Minutes of floor time per inquiry | ~10 | 0 |
| Floor time per week | ~200 minutes | 0 |
| Customer contacts per inquiry | 2 | 1 |
| Time to answer | hours | ~30 seconds |
Three and a half hours a week of supervisor and operator time is the visible saving, and it is real. The larger one is the halving of customer contacts, because the second call is where a routine question turns into an anxious one. A customer who gets an immediate, specific answer usually stops calling; a customer who gets a callback tomorrow starts calling weekly.
Who Should Be Reading It
The change that makes this stick is not the report, it is who has access to it. If only the planner can open the progress reports, every status question still routes through one person and you have moved the bottleneck rather than removed it.
Give customer service read access to the progress family. They will use it because it is faster than asking, and the planner stops being an information desk. That is the same principle behind putting the standup board on a screen instead of reading status aloud in a meeting. See how a shared plan shortens the daily production meeting.
What the Reports Cannot Tell a Customer
They are only as current as the logging. Percent complete reads logged hours. If operators log at the end of the week, Thursday's answer describes last Friday, and a confident wrong answer is worse than a callback. See EDGEBIC actuals tracking explained.
They are point-in-time. Every report queries fresh when you open it and caches nothing, which means it is accurate at the moment you read it and says nothing about the next hour. When a report drives a commitment, export it so the promise keeps its arithmetic.
Percent complete is not percent of the way to the door. It measures hours against the plan for the operations on the job. Packing, inspection outside the routing, and shipping lead time are separate, and a customer hearing 95 percent will assume otherwise unless you say so.
A forecast late is not a promise broken. On-Time Delivery judges finished jobs by their actual end and unfinished jobs by their scheduled end, which makes it an early-warning list as well as a scorecard. Telling a customer a job is trending late while there is still time to act is a different call from telling them it missed. See the generic on-time delivery KPI.
It cannot see work run outside the plan. A job pulled forward on the floor and never entered will read as untouched. The record is complete for what the software planned and blind to what it never saw. See what production scheduling is for the underlying model.
Want to see your own orders answered from a desk? Bring a customer order and its jobs to a demo and we will run the status call in front of you.
By reading the order's own progress record. In EDGEBIC by User Solutions the Sales Order Progress report rolls a whole customer order into one view, Job Progress shows percent complete for every job in a single snapshot with no date range, and Work Center Progress breaks one job into steps so you can name the operation that is behind. Those three answer the status question from the desk, in about 30 seconds, without interrupting anyone at a machine.
Percent complete is hours-first: actual hours logged divided by planned hours, falling back to pieces only when no hours exist. A job reads Completed only when every operation step carries an actual end date, so marking one early step complete does not flip the job, and the finish date stays empty until the last step is done. That rule keeps the number honest, because a job at 92 percent with one operation untouched is genuinely not finished.
Because one question costs three interruptions and a delay. The customer service rep stops what they are doing, a supervisor is pulled off the floor to look, and often an operator is interrupted mid-setup to confirm. Then the rep calls the customer back, which is a second contact for something that should have been one. On a plant taking 20 status calls a week, that is roughly an hour of supervisor time and a reputation for being slow to answer simple questions.
Expert Q&A: Deep Dive
Q: Our customer service team calls the floor for status maybe twenty times a week. What is that really costing?
A: Assume ten minutes of supervisor and operator time per inquiry once you count finding the job, checking it, and reporting back. Twenty calls is about 200 minutes a week of floor time, roughly three and a half hours, and it lands in fragments during setups, which is when interruptions cost the most. Then add the callback: most of those questions become two customer contacts instead of one. Reading Sales Order Progress at the desk turns each into a 30 second lookup with no floor contact at all, and the customer gets an answer while still on the phone, which is the part they actually notice.
Q: A customer wants to know not just where the order is but why it is late. Can I answer that in the same call?
A: Usually yes, with three more lookups. Late Jobs shows how late and carries a blocker hint on the row. Work Center Progress, filtered to that job, names the operation that stalled and shows hours logged against hours planned on it. Reschedule History shows whether the job was moved, by how much, and when. That gets you to a sentence like: the mill step has 41 of 101 hours logged with nothing added in three days, and the job was pushed four days on Thursday's run. The customer gets a cause and a plan instead of an apology, which is a materially different call.
Frequently Asked Questions
Ready to Transform Your Production Scheduling?
User Solutions has been helping manufacturers optimize their production schedules for over 35 years. One-time license, 5-day implementation.

User Solutions Team
Manufacturing Software Experts
User Solutions has been developing production planning and scheduling software for manufacturers since 1991. Our team combines 35+ years of manufacturing software expertise with deep industry knowledge to help factories optimize their operations.
Share this article
Related Articles
What a Plan Built on Yesterday's Data Costs You
A schedule is only as current as its last data refresh. What goes wrong when that refresh depends on someone remembering, what an automatic sync changes, and the limits worth knowing before you trust it.
The Furnace Does Not Care How Many Hours Are Left
Batch equipment takes one job per chamber per day whatever the clock says. Scheduling it as pooled hours over-promises the constraint by a factor you can calculate.
How an Adherence Percentage Becomes an Investigation List
A percentage tells you the plan is not being followed and nothing else. The count of operations behind it is a finite work list, and pairing it with attainment tells you which of two problems you have.