- A Tour of EDGEBIC Options and Settings
The EDGEBIC settings divide into engine settings that change how the schedule is computed and display settings that change how it looks, plus the administrative surfaces for the datasource, users and roles, and data management. In EDGEBIC by User Solutions the configuration is not one long preferences list. It is a small number of purposeful screens, and knowing which screen owns what keeps administration calm: display changes are always safe, plan changes are always deliberate.
This post is a map, not a deep dive on any one setting. For the full reference behind every screen here, read the EDGEBIC admin guide. It names controls at the tab and screen level, never any internal path.
The Two Kinds of Setting
The most useful mental model for EDGEBIC settings is the split between display and engine.
Display settings change how the schedule is presented. The scheduler and Gantt configuration, the actual-versus-planned overlay, and the variance thresholds that color a job on time or late all live here. Changing them changes the picture and never the plan. A planner can tune the view all afternoon and no job moves.
Engine settings change how the schedule is computed. The scheduling policy and the optimizer engine choice live here. Changing one of these can change the plan on the next run, so they sit apart from the display settings on purpose.
Hold this split and the rest of the tour falls into place. When someone asks "is it safe to change this?" the answer is usually just "is it display or engine?"
The Administrative Surfaces
Beyond the scheduling settings, a handful of screens are the administrator's core.
- The DataSource tab is where you choose between the local single-file database and a shared SQL Server database, enter and test connection details, and export a backup. It is the home of the datasource switch, covered in switching the EDGEBIC datasource.
- Users and roles is where accounts are created, deactivated, and assigned permissions. Who can reschedule, who can only log actuals, and who can reach data management are all decided here, as role-based access explains.
- Data management holds the utilities, including the guarded Clear Data Tables tool and the layout resets. It is the screen you visit rarely and deliberately.
These three cover the datasource, the people, and the destructive operations: the administrator's real responsibilities. Everything else is either display tuning or the scheduling policy.
The Scheduling Policy and the Optimizer
The scheduling policy is the engine setting that most affects results. It is where the optimizer engine is chosen, between the multi-run engine and the mathematical optimization engine.
- The multi-run engine evaluates many complete schedules with different orderings and returns the best one, guaranteed never worse than the baseline. It is a search, not a promise of perfection, and its guarantee is exactly the never-worse clamp.
- The mathematical optimization engine solves the scheduling model directly and reports a proven optimality gap, so you know how close the result is to the theoretical best.
Two design choices make this safe to administer. The optimizer ships behind a setting that starts off, so a plant adopts it deliberately. And selecting an engine never breaks scheduling: if the chosen engine is unavailable on a given host, the system falls back to the standard engine rather than failing. You can enable optimization, and you can change your mind, without ever putting scheduling itself at risk. The deeper mechanics live in the optimization material for planners who want them.
Display Configuration Worth Knowing
On the display side, two settings come up often enough to name. The actual-versus-planned overlay shows logged actuals against the original plan on the same view, which is how a supervisor sees drift at a glance. The variance thresholds decide when a job colors as on time, at risk, or late, so a plant can tune the coloring to its own tolerance for slip. Both are display settings: they change what you see, never what the schedule does.
This is the reassuring part of the settings tour. The screens a planner touches most are the ones that cannot cause harm, so day-to-day tuning is low-stakes by design.
A Quick Reference
| Screen | Kind | What it controls |
|---|---|---|
| DataSource tab | Administrative | Local vs SQL Server, connection, backup export |
| Users and roles | Administrative | Accounts and permissions |
| Data management | Administrative | Clear Data Tables, layout resets |
| Scheduler and Gantt config | Display | Overlay, variance coloring, view layout |
| Scheduling policy | Engine | Optimizer engine, objective |
The whole administrative and configuration surface fits on one page, which is a fair summary of the design: purposeful screens, a clean split between safe display tuning and considered engine changes, and destructive operations gathered in one guarded place.
For where to begin, see how to install and connect EDGEBIC, and for the general context these settings serve, read what production scheduling is. The full administrator reference is the EDGEBIC admin guide.
Expert Q&A: Deep Dive
Q: A planner wants to change how the Gantt looks but is afraid of altering the actual schedule. Which settings are safe?
A: The scheduler and Gantt display configuration are safe to change freely, because they control how the schedule is presented, not how it is computed. Turning on the actual-versus-planned overlay, adjusting variance thresholds for coloring, or changing the Gantt layout all change the picture, never the plan. The settings that can change the plan (the scheduling policy and the optimizer engine) live separately and are the ones to treat carefully. Point the planner at the display configuration with confidence: nothing there will move a job.
Q: We want to try the optimizer without risking our current schedules. How do we do that safely?
A: Turn on the optimizer through the schedule settings, knowing it ships off by default so nothing changes until you opt in. The multi-run engine is guaranteed never worse than your current baseline, so a run cannot hand you a plan worse than what you have, and no proposed schedule is applied until a planner accepts it. That deferred-apply design means you can generate an optimized proposal, compare it to your current plan, and discard it if you do not like it. Start with a single job or a small set, review the proposal, and only accept when the comparison convinces you.
Frequently Asked Questions
Ready to Transform Your Production Scheduling?
User Solutions has been helping manufacturers optimize their production schedules for over 35 years. One-time license, 5-day implementation.

User Solutions Team
Manufacturing Software Experts
User Solutions has been developing production planning and scheduling software for manufacturers since 1991. Our team combines 35+ years of manufacturing software expertise with deep industry knowledge to help factories optimize their operations.
Share this article
Related Articles
How to Tell Whether Anything Is Actually Hosting Your Syncs
A healthy idle integration host writes no run rows, so run history cannot tell you whether anything is running. What the liveness beacon reports, including from workstations that host nothing.
Reading the EDGEBIC Scheduling Session Log
The scheduling session log is the third diagnostic surface: a decision-by-decision trace of one scheduling run. What it records, how to read it, and when to switch it off.
What to Decide Before Several Workstations Share One EDGEBIC Database
The software handles the mechanics of several planners on one database. These are the eight decisions it cannot make for you, and what each one costs if you skip it.