How to Set How Partial Completions Are Handled in EDGEBIC
To set how EDGEBIC handles partial completions, open Settings, go to the Schedule tab, and choose under Partial-Confirm Behavior: trust the operator's actual end, forward-shift the remaining hours, or trust unless the step is flagged short. The policy in EDGEBIC by User Solutions decides what the engine does with the gap when an operation is marked finished but logged fewer hours than planned, and it is read fresh on the next scheduler run.
This post covers the one policy. For the full scheduling rulebook it belongs to, read how to configure scheduling policy in EDGEBIC; the full task library is at the EDGEBIC how-to hub.
Before You Start
- You can reach the Settings tab, which is permission-controlled.
- You understand a short confirm: an operation marked finished with fewer logged hours than planned.
- You know that whichever policy you pick, completed operations never move; the policy only governs future work.
The Steps
- Open the Settings tab and select the Schedule tab.
- Find Partial-Confirm Behavior and choose one:
- Trust the operator's Actual End: the finish stamp is final; the missing hours are written off.
- Forward-shift the remaining hours (the default): the gap between planned and logged is re-planned on a future slot, and downstream steps queue behind it.
- Trust Actual End unless the step is flagged short: trust the stamp everywhere except on routing steps individually flagged for strict tracking.
- Click Save. The status line confirms it.
- Run the scheduler (or reschedule) so the new policy takes effect.
What Changes When You Save
| Setting | Takes effect | Affects existing data? |
|---|---|---|
| Partial-Confirm Behavior | The next scheduler or reschedule run | Re-plans only future work; completed operations never move. |
The choice changes where the next reschedule places downstream work after a short confirm. Trusting the stamp pulls downstream work earlier, because the shortfall is written off and the operation is treated as done. Forward-shifting keeps the unfinished hours visible in the plan, so downstream work queues behind the re-planned remainder. The hybrid lets you make that decision per routing step instead of once for the whole site.
The policy matters most in the end-of-day reschedule, when a shift's short confirms all land at once. If you run an evening reschedule to reflect the day's production, the choice here decides whether tomorrow's plan absorbs the shortfalls or writes them off. Forward-shift keeps the unfinished hours in view so tomorrow queues behind them, which is the honest picture in a shop where operations sometimes need more time than logged. Trust pulls tomorrow's work earlier, which suits a shop where the operator's close-out is the final word and there is no rework to worry about. Pick the one that matches how your floor actually reports, and keep it stable so the plan reads the same way night after night.
How to Check It Worked
Short-confirm one operation (log fewer hours than planned and stamp the end), then reschedule and read the plan. Under trust, the operation shows no remaining hours and downstream work moves up. Under forward-shift, a fresh future slot appears for the leftover hours and downstream work sits behind it. If the plan does not reflect your policy, confirm you saved the setting and ran the scheduler afterward; the policy is read at run time, not at save time.
Common Mistakes
Expecting the policy to move completed work. It never does. Only future work is re-planned. Completed operations are immutable.
Changing the policy but not rescheduling. The policy is read on the next run. Until you reschedule, the plan still reflects the old behavior.
Choosing trust in a shop with rework loops. Trusting the actual end writes off the shortfall. If operations routinely need more time than logged and that time matters, forward-shift keeps it honest.
Setting the hybrid without flagging anything. Trust Actual End unless the step is flagged short behaves exactly like plain trust until you flag the steps that should forward-shift. Flag the exceptions or the hybrid does nothing different.
What to Do Next
Partial-Confirm Behavior is about what the engine does with a short confirm; recording the short confirm itself is a separate task. How to record a partially finished operation in EDGEBIC covers the logging side. For how reschedules preserve finished work while re-planning the rest, EDGEBIC rescheduling explained is the overview, and the EDGEBIC product page shows the scheduler this policy feeds.
Expert Q&A: Deep Dive
Q: An operator marked a 10-hour milling op done after logging 6 hours. What happens to the missing 4 hours under each setting?
A: It depends entirely on Partial-Confirm Behavior. Under Trust the operator's Actual End, the 4 hours are written off; the operation is done, downstream work starts after the stamped end, and the plan shows no remaining milling. Under Forward-shift the remaining hours (the default), the 4-hour gap is re-planned on a fresh future slot and downstream steps queue behind that remainder, so the plan keeps the unfinished work honest. Under Trust Actual End unless the step is flagged short, the milling step is written off unless someone flagged it for strict tracking, in which case it behaves like forward-shift. Pick trust where the operator's close-out is authoritative and forward-shift where you would rather see the shortfall than lose it.
Q: We keep the default forward-shift, but for our final inspection step we never want leftover hours re-planned. Can we do both?
A: Yes, that is exactly what the hybrid setting is for. Leave the site policy on Forward-shift the remaining hours for everything, then switch to Trust Actual End unless the step is flagged short and mark only the operations where a short confirm should be re-planned as flagged. Everywhere that is not flagged, the operator's actual end is trusted and the shortfall is written off; the flagged steps still forward-shift. If your goal is the reverse, that most steps forward-shift and only inspection is trusted, then the plain Forward-shift default with inspection left unflagged under the hybrid gives you strict tracking everywhere except the steps you deliberately leave alone. Decide which behavior is the exception and flag accordingly.
Frequently Asked Questions
Ready to Transform Your Production Scheduling?
User Solutions has been helping manufacturers optimize their production schedules for over 35 years. One-time license, 5-day implementation.

User Solutions Team
Manufacturing Software Experts
User Solutions has been developing production planning and scheduling software for manufacturers since 1991. Our team combines 35+ years of manufacturing software expertise with deep industry knowledge to help factories optimize their operations.
Share this article
Related Articles
How to Create a Watched-File Integration in EDGEBIC
Create a watched-file integration in EDGEBIC: point it at the file your ERP drops, pick the target entity and import mask, set the debounce, and let a new file trigger the run.
How to Rehearse an Integration With the EDGEBIC Simulator
Use the built-in Simulator to provision demo data, watch real integration runs happen, and prove the mechanism before you point anything at a live ERP. Includes the tear-down rule.
How to Run an Integration Now and Pause All Schedules in EDGEBIC
Force one integration to run with Run Now, cancel a run in progress, disable a single definition, or tick Pause all schedules to stop every automatic sync for the session.