The resource replacement audit in EDGEBIC by User Solutions lives in the Reports hub: it takes a date range and returns every work-center swap in that window with the job, the old station, the new station, the person who made the move, and the reason. When a job runs on a different machine than the plan first assigned, this is the report that tells you who changed it and why.
It is the routing companion to the reschedule history report, which answers the same who-and-why question about dates rather than stations. Both feed the wider case for audit-ready scheduling. Every task in this library is mapped on the EDGEBIC how-to hub.
Before You Start
- Work-center swaps have actually happened in the window. The audit reads swap events; if nobody re-routed a job, the grid is empty by design.
- Your team enters a reason on manual swaps, if you want the reason column to be useful.
- You know the difference between a manual swap and an automatic alternative selection. Only the former is recorded here.
Step 1: Open the Audit and Set the Window
Open Reports from the main navigation and click the Resource Replacement Audit card. A date range dialog appears. Set the From and To dates to cover the period you want to examine, then click OK. The report reads the schedule change log for work-center swap events in that window and builds one row per swap.
Step 2: Read a Swap Row
Each row records a single re-routing decision:
- Job and the operation involved, so you know exactly which step moved.
- Old work center and new work center, the stations the step left and landed on.
- Event time, the timestamp of the change.
- Actor, the person who made the swap.
- Reason, the free text they entered, when they entered it.
Together these columns are a chain of custody for every routing change: which step, from where to where, by whom, when, and why.
Step 3: Group by the New Station to Find Patterns
Right-click the new-work-center column header and choose Group By This Column. The grid collapses into buckets by destination station. A single alternative absorbing most of the swaps is a structural signal: the primary station those jobs belong to is overloaded, and planners are offloading to the same alternative over and over. That is a capacity problem to fix, not a run of unrelated decisions.
Step 4: Filter to One Job for a Customer Question
Right-click the job column header, choose Filter Editor, and set the filter to a single job number. The grid narrows to that job's re-routing history. This is the fastest way to answer "why did this order run on a different machine than we quoted", because the surviving rows are the complete, timestamped account.
How to Check It Worked
The audit is a read-only snapshot, so there is nothing to save. Confirm it worked by checking that a swap you know happened, such as an operation you personally dragged to another machine, appears with the correct old and new stations. If a change you expected is missing, it was almost certainly an automatic alternative selection during a schedule run rather than a manual swap.
What the Audit Does Not Capture
The report records manual work-center swaps only. When the scheduler chooses an alternative work center on its own during a run, because the primary was full, that selection is not logged as a swap event. To trace automatic alternative selection, use the step-level progress views, which preserve the original station each step was replaced from. Keep this boundary in mind: an empty audit does not mean no jobs changed stations, only that no planner manually moved one.
Common Mistakes
- Expecting automatic re-routes to appear. Only planner-made swaps are recorded. Scheduler-chosen alternatives live in the progress reports.
- Reading a blank reason column as a system fault. The reason is entered by a person at swap time. Empty means nobody typed one, which is a policy gap, not a bug.
- Judging a busy alternative as a good thing. One station absorbing most re-routes is a symptom of an overloaded primary, not efficient flexibility. Fix the primary's capacity.
- Forgetting the date angle. A swap that also moved the schedule shows here for the station change and in the reschedule history for the date change. Run both for the full picture.
Related Reading
- Reschedule history report: the same accountability, for dates instead of stations.
- How to run, filter, and export reports: the grid controls that make grouping and filtering fast.
- EDGEBIC platform overview: where the audit trail fits in the wider system.
Expert Q&A: Deep Dive
Q: One alternative work center appears as the new station on dozens of swap rows this month. What is that telling me?
A: It is telling you the primary station those jobs were meant to run on is chronically overloaded, and your planners are manually offloading to the same alternative again and again. Group the audit by the new-work-center column and the pattern jumps out: one station absorbing most of the re-routes. That is a structural signal, not a series of one-off decisions. Either the primary needs more capacity, or the alternative should be promoted so the scheduler routes to it automatically instead of leaving your planners to do it by hand every week. Cross-check the primary in the Work Center Utilization report to confirm it is running over 100 percent for the window.
Q: A customer is asking why their job ran on a different machine than we quoted. How do I answer with evidence?
A: Run the resource replacement audit for the window covering that job's life and filter to the job number. Each row shows the original work center, the station the operation actually moved to, the timestamp, the person who made the swap, and any reason they recorded. That is a documented, timestamped chain of custody for the routing change. Export it to Excel and the row itself is the answer: the operation moved from station A to station B on this date, made by this planner, for this reason. Pair it with the reschedule history if the move also shifted the dates, and the customer gets one coherent account.
Frequently Asked Questions
Ready to Transform Your Production Scheduling?
User Solutions has been helping manufacturers optimize their production schedules for over 35 years. One-time license, 5-day implementation.

User Solutions Team
Manufacturing Software Experts
User Solutions has been developing production planning and scheduling software for manufacturers since 1991. Our team combines 35+ years of manufacturing software expertise with deep industry knowledge to help factories optimize their operations.
Share this article
Related Articles
How to Create a Watched-File Integration in EDGEBIC
Create a watched-file integration in EDGEBIC: point it at the file your ERP drops, pick the target entity and import mask, set the debounce, and let a new file trigger the run.
How to Rehearse an Integration With the EDGEBIC Simulator
Use the built-in Simulator to provision demo data, watch real integration runs happen, and prove the mechanism before you point anything at a live ERP. Includes the tear-down rule.
How to Run an Integration Now and Pause All Schedules in EDGEBIC
Force one integration to run with Run Now, cancel a run in progress, disable a single definition, or tick Pause all schedules to stop every automatic sync for the session.