- Home
- Blog
- EDGEBIC How-To
- How to Import Shifts from a File in EDGEBIC
Importing shifts into EDGEBIC by User Solutions uses the Shift entity on the Import tab: map the shift name and a start and end pair for each weekday, run the mask, and your whole shift pattern loads at once. Shifts are matched by name, so a re-run never duplicates them, and a blank start-and-end pair simply marks a day off. Here is the full task.
For the import mechanics that apply everywhere, see how to import work centers from Excel. To build a shift by hand on screen instead, see how to set daily working hours and breaks. Every task in this library is mapped on the EDGEBIC how-to hub.
Before You Start
- Your file has one row per shift, with a shift name in every row. Name is the natural key.
- Each weekday the shift runs has both a start time and an end time. A one-sided day fails.
- You can reach the Settings tab, since Import lives there and is permission-controlled.
Step 1: Open Import and Pick Shift
Open the Settings tab, click the Import tab, and select Shift in the Entity Type list. This loads global shifts, the site-wide patterns your work centers reference for their capacity.
Step 2: Build the Mask
Click Define New, name the mask, for example Shift Patterns, click Get File, and pick your spreadsheet. Choose the Sheet for an Excel file. The headings appear under File Header Titles ready to map.
Step 3: Map the Name and the Weekday Pairs
Drag the shift-name heading onto the Shift name row, which carries the Req tick. Then map the weekday time columns, one start and one end for each day the shift runs.
| Column | What it does |
|---|---|
| Shift name (required) | The label and natural key |
| Monday start / Monday end (and each weekday) | The working window for that day; blank both for a day off |
| Max hours per day | Optional cap on daily hours |
| Is overtime allowed | Optional overtime flag |
| Is active | Optional active flag |
The rule that catches people: a blank pair means the shift is off that day, but a start with no end (or an end with no start) is an error. Fill both cells of a day, or blank both.
Click Save.
Step 4: Run It
Select the mask and click Do It. The Import Result dialog reports Created ... Updated ... Reused ... Failed .... A row with a one-sided weekday fails with a clear message while the rest of the run continues.
Step 5: Re-run and Update Safely
Shifts are matched by name, so re-importing a revised file finds and reuses the existing shifts. To change hours on shifts that already exist, tick UpdateExistingRecords in the mask Options before the run; without it, matches are reused unchanged.
What Changes When You Import
The imported shifts appear immediately in the shift list and become available to assign to work centers. The schedule does not change on import: a shift has to be assigned to a work center, and the scheduler re-run, before it affects any plan. One log file is written per run, opened from the result dialog.
How to Check It Worked
Open the shift list and confirm each imported shift shows the right hours for each weekday, with the days off blank. Then assign a shift to a work center, run Drive Schedule, and confirm that work center only books work inside the shift's hours. A work center that schedules outside the expected window usually has a different shift assigned than you intended.
Common Mistakes
- A one-sided weekday. A start with no end has no length. Complete the pair or blank both cells.
- Forgetting to assign the shift. An imported shift schedules nothing until a work center references it.
- Expecting the plan to move on import. Shifts loaded but the plan unchanged means the scheduler has not run since.
- Blanking a name. Name is the key. A blank name cell fails the row.
Next Steps
- Load your closed days with how to import plant holidays from a file.
- Choose whether a mask updates or reuses with how to set import options for a mask.
- See how shifts and calendars drive capacity on the EDGEBIC product page.
Expert Q&A: Deep Dive
Q: We run a day shift and a night shift across all machines. Can I load both in one go?
A: Yes. Put two rows in the file, one named Day Shift and one named Night Shift, each with a start and end pair for the weekdays it runs. The night shift crosses midnight, which the import handles as start and end times on the same weekday row. Blank the weekend pairs if the shifts are Monday to Friday. Import them in a single Shift run, then assign the shifts to your work centers so the scheduler has capacity windows to book against.
Q: A couple of shift rows failed and the message mentions a one-sided day. What happened?
A: One weekday has a start time but no matching end time, or the reverse. A shift day needs both ends to have a length, so the importer rejects the incomplete pair rather than guessing. Open the source file, find the weekday with only one cell filled, and either complete the pair with the real end time or blank both cells to make it a day off. Re-run the same mask afterward: shifts key on name, so the fixed rows update and the good ones come back reused.
Frequently Asked Questions
Ready to Transform Your Production Scheduling?
User Solutions has been helping manufacturers optimize their production schedules for over 35 years. One-time license, 5-day implementation.

User Solutions Team
Manufacturing Software Experts
User Solutions has been developing production planning and scheduling software for manufacturers since 1991. Our team combines 35+ years of manufacturing software expertise with deep industry knowledge to help factories optimize their operations.
Share this article
Related Articles
How to Create a Watched-File Integration in EDGEBIC
Create a watched-file integration in EDGEBIC: point it at the file your ERP drops, pick the target entity and import mask, set the debounce, and let a new file trigger the run.
How to Rehearse an Integration With the EDGEBIC Simulator
Use the built-in Simulator to provision demo data, watch real integration runs happen, and prove the mechanism before you point anything at a live ERP. Includes the tear-down rule.
How to Run an Integration Now and Pause All Schedules in EDGEBIC
Force one integration to run with Run Now, cancel a run in progress, disable a single definition, or tick Pause all schedules to stop every automatic sync for the session.