To create a quote in EDGEBIC by User Solutions you open the Quote tab, click the add-quote button to launch the Quote Configuration dialog, fill a handful of fields, and click Save. The quote lands in the grid as a Draft with a preliminary routing-based cost estimate, and nothing on your production schedule moves. This guide covers the pure creation task: getting a clean, valid draft on the board. Pricing, simulation, and conversion each get their own recipe.
For the wider field-by-field walkthrough that also covers simulation and pricing, read how to build and price a quote. Every task here is documented behavior of EDGEBIC, and the full task library lives in the how-to hub.
Before You Start
- The product you are quoting has a Bill of Routing. The quote's later simulation schedules that routing, and a product with no routing cannot be simulated.
- You know the quantity and the customer's own reference or purchase order number.
- A customer record exists (recommended). You can type a free-text reference instead, but a linked record carries through to the order and the reports.
Step 1: Open the Quote Configuration Dialog
Open Schedule from the main navigation, then click the Quote tab. Click ➕ Quote. The Quote Configuration dialog opens with three field groups: Basic Information, Pricing and Quantities, and Important Dates. The Product and Customer dropdowns refresh as the dialog opens, so the lists are current.
Step 2: Fill the Required Fields
Work through the groups. The fields that must be filled to save a valid draft are:
| Field | What to enter |
|---|---|
| Product (BOR): | The product being quoted; it must have a routing |
| Customer Reference: | The customer's reference or purchase order number |
| Quantity: | The number of units, at least one |
| Quote Date: | The date you raised the quote |
| Expiry Date: | How long the quote is valid; defaults to thirty days out |
| Target Start Date: | The date the later simulation anchors on |
Leave Unit Price: at zero if you want the system to derive it from cost and markup after the first simulation, or type a negotiated price now. Selecting a customer in Customer Id: pre-fills the contact person, email, and phone from the customer record when those are set.
The dialog holds more than the six required fields. The optional ones shape pricing and scheduling later:
| Field | What it does |
|---|---|
| Contact Person: / Contact Email: / Contact Phone: | Who receives the quote; pre-filled from the customer, editable per quote |
| Markup % | The percent applied to internal cost to derive the unit price; default 25% |
| Manual Cost Override | Replaces the rolled-up cost as the pricing basis; shows (use calculated) when blank |
| Scheduling Direction: | Forward or Backward, defaulting from Settings, deciding what the target start date means |
| Status: | The lifecycle status, starting at Draft |
| Sales Order: | Optionally ties the quote to a sales order filtered by the selected customer |
| Customer Notes: / Internal Notes: | Customer notes print on the quote; internal notes never leave the building |
Each optional field has a later recipe, moving the quote off Draft included, so a first draft does not need any of them. The Cost Analysis panel in the dialog fills with a routing-based estimate as you pick a product and set a quantity, giving a quick sanity check before you ever simulate.
Adding a new customer without leaving the dialog
If the customer is not yet in the system, click the + button beside the Customer Id: field. A customer form opens on top of the quote. Fill in the name and contact details, save, and control returns to the quote with the new customer already selected and its contact fields pre-filled. You finish the quote in one pass. The customer name is required (two to two hundred characters), and an email, if given, must be a valid address.
Step 3: Set a Quote Number
Leave the quote number blank to accept an auto-generated value such as Q0011, or type your own external reference such as QUO-2026-011. Custom numbers allow letters, digits, dashes, and underscores, run two to fifty characters, and must be unique across all quotes.
Step 4: Save
Click Save. The quote appears in the grid with Status Draft and a preliminary routing-based cost estimate in the hours and cost columns.
What Changes When You Save
Saving writes one quote row and stamps the preliminary estimate fields. It does not touch the production schedule, the work-center load, or any existing job. The estimate you see is line-item math from the routing (setup plus per-unit hours times quantity, priced at the step or work-center rates, plus material). It assumes no capacity constraint. Nothing reaches the calendar until you convert the quote to an order and run a schedule.
How to Check It Worked
Find your new row in the grid. Confirm the Status column reads Draft and the quote number matches what you typed or the auto-generated Q####. The cost and hours columns hold the preliminary estimate. To narrow the list while you verify, use the Draft status filter radio at the top of the grid.
Worked Example: A Clean Draft for Acme
Acme Industries wants a price on 200 units of Widget-A. You open the Quote tab, click ➕ Quote, and in the Quote Configuration dialog set Product (BOR): to Widget-A, Customer Id: to Acme Industries, Customer Reference: to ACME-PO-4471, and Quantity: to 200. You leave Unit Price: at zero so the system can derive it from cost after simulation, and you leave Markup % at its 25% default. Quote Date: is today, Expiry Date: defaults thirty days out, and Target Start Date: is a week from now.
You type a readable quote number, QUO-2026-011, instead of accepting the auto-generated Q0011, because the customer will see it. You click Save. The row appears with Status Draft. The Cost Analysis panel already shows a routing-based estimate from Widget-A's steps, but no dates yet, because you have not simulated. That is the correct state of a clean draft: enough data to save and simulate, nothing promised.
Common Mistakes and Gotchas
- A special character in the quote number is rejected. The allowed set is letters, digits, dashes, and underscores. Slashes, dots, parentheses, spaces, and the at sign all fail. Replace a slash in a date-stamped reference with a dash.
- A duplicate quote number blocks the save. Numbers must be unique. If the save is rejected with an "already exists" message, pick a different number.
- A zero unit price only warns, it does not block. The validator flags it so you verify the price is intentional, but the quote still saves. A quantity above ten thousand also warns rather than blocks.
- The preliminary estimate is not the promise. The hours and cost on a never-simulated quote ignore shop load. Do not quote a date from them. Run the delivery-date simulation before you commit to a customer.
Once the draft exists, the next step is almost always the simulation, which turns the routing math into a capacity-aware start date, end date, and real cost.
Expert Q&A: Deep Dive
Q: A new customer called for a quote and they are not in our system yet. Do I have to stop and set them up first?
A: No. Inside the Quote Configuration dialog there is a plus button beside the Customer field that opens a customer form on top of the quote. Fill in the name and contact details, save, and control returns to the quote with the new customer already selected and its contact person, email, and phone pre-filled into the quote's contact fields. You finish the quote in one pass without leaving the dialog.
Q: I saved the quote but the cost and hours columns already show numbers even though I never simulated. Are those real?
A: They are preliminary, not capacity-aware. Before you simulate, the grid shows a routing-based estimate: the sum of setup and per-unit hours across the routing steps times the quantity, priced at the step or work-center rates, plus material. It is a quick sanity check that scales linearly with quantity. It ignores current shop load and queueing. The real numbers arrive only after you run the simulation, which schedules the quote against your actual capacity.
Frequently Asked Questions
Ready to Transform Your Production Scheduling?
User Solutions has been helping manufacturers optimize their production schedules for over 35 years. One-time license, 5-day implementation.

User Solutions Team
Manufacturing Software Experts
User Solutions has been developing production planning and scheduling software for manufacturers since 1991. Our team combines 35+ years of manufacturing software expertise with deep industry knowledge to help factories optimize their operations.
Share this article
Related Articles
How to Create a Watched-File Integration in EDGEBIC
Create a watched-file integration in EDGEBIC: point it at the file your ERP drops, pick the target entity and import mask, set the debounce, and let a new file trigger the run.
How to Rehearse an Integration With the EDGEBIC Simulator
Use the built-in Simulator to provision demo data, watch real integration runs happen, and prove the mechanism before you point anything at a live ERP. Includes the tear-down rule.
How to Run an Integration Now and Pause All Schedules in EDGEBIC
Force one integration to run with Run Now, cancel a run in progress, disable a single definition, or tick Pause all schedules to stop every automatic sync for the session.