- Home
- Blog
- Case Studies
- Smart Coffee Machines Get Smarter Purchasing

For manufacturers of smart coffee machines, the production challenge is not just scheduling — it is knowing exactly which raw materials need to be purchased, in what quantity, and by what date. With complex bills of materials spanning electronic components, mechanical parts, and specialized brewing elements, getting purchasing wrong means either production delays from missing parts or excess inventory from over-ordering.
This manufacturer found their solution in Resource Manager DB — an affordable MRP add-on that linked to their existing ERP system and solved the purchasing visibility problem.
Read the full smart coffee machine success story.
The Challenge: Purchasing Blindly
The manufacturer described their core problem directly: "The big problem we have is knowing exactly which raw material was needed to be purchased (qty and date) based on BOM, minimum quantity to order and basic costing."
This is the classic MRP challenge: translating a production schedule into precise material requirements. Without MRP calculations, purchasing teams either over-order (tying up cash in inventory) or under-order (causing production delays). Both are expensive.
The existing ERP system handled basic operations but lacked the integrated MRP calculations that would connect production schedules to purchasing requirements automatically.
The Solution: Affordable MRP That Links to ERP
The manufacturer chose Resource Manager DB for a specific reason: "We chose Resource Manager-DB because it was the only affordable program available where we could link to our existing ERP system and have MRP calculated."
What RMDB Delivered
Automatic MRP calculations — Based on production schedules, BOMs, and inventory levels, RMDB calculated exactly what needed to be purchased, when, and in what quantities.
ERP integration — The system linked directly to the existing ERP, pulling data and synchronizing requirements without manual data entry or duplicate systems.
BOM-based purchasing — Complex bills of materials with multiple levels of components were automatically exploded into purchasing requirements, accounting for minimum order quantities and basic costing.
The Result
"The biggest benefit with using Resource Manager-DB is the increased efficiency in purchasing department." By eliminating manual calculations and spreadsheet-based guesswork, the purchasing team could focus on supplier management and cost optimization rather than figuring out what to order.
Why MRP Add-On Is the Smart Approach
Full MRP Systems Are Expensive
Standalone MRP systems or full ERP replacements cost tens or hundreds of thousands of dollars and take months to implement. For a manufacturer that already has an ERP handling basic operations, adding MRP as an affordable add-on delivers the capability at a fraction of the cost and time.
Purchasing Efficiency Compounds
Every dollar saved in purchasing efficiency compounds: less excess inventory, fewer stockouts, better supplier terms from accurate forecasting, and reduced expediting costs. The smart coffee machine manufacturer's experience of "increased efficiency in purchasing department" translates directly to reduced costs.
Consumer Electronics Complexity
Smart coffee machines involve electronics, mechanical systems, and specialty components — each with different lead times, suppliers, and minimum order quantities. Manual purchasing calculations for this level of BOM complexity are error-prone. MRP handles the math accurately and consistently.
Frequently Asked Questions
How did RMDB improve purchasing for smart coffee machine manufacturing?
Resource Manager DB provided automatic MRP calculations linked to the existing ERP system, telling the purchasing department exactly which raw materials were needed, in what quantities, and by what dates. The biggest benefit was increased efficiency in the purchasing department.
What makes Resource Manager DB an affordable MRP solution?
The manufacturer chose RMDB because it was the only affordable program where they could link to their existing ERP system and have MRP calculated automatically. Unlike full ERP replacements, RMDB adds MRP capability without the cost and complexity of a system migration.
Can scheduling software handle complex bills of materials for electronics?
Yes. Smart coffee machines have complex BOMs spanning electronic components, mechanical parts, and specialized brewing elements. Resource Manager DB handles this BOM complexity while calculating material requirements based on production schedules and minimum order quantities.
Get Smarter Purchasing
If your purchasing team is guessing at material requirements instead of calculating them from production schedules and BOMs, Resource Manager DB can fix that. Request a free demo and see MRP in action with your data.
Read the full success story and explore all scheduling success stories.
Frequently Asked Questions
Ready to Transform Your Production Scheduling?
User Solutions has been helping manufacturers optimize their production schedules for over 35 years. One-time license, 5-day implementation.

User Solutions Team
Manufacturing Software Experts
User Solutions has been developing production planning and scheduling software for manufacturers since 1991. Our team combines 35+ years of manufacturing software expertise with deep industry knowledge to help factories optimize their operations.
Share this article
Related Articles

5-Day Implementation: Our Proven Scheduling Software Framework
How User Solutions implements production scheduling software in 5 days, not months. The day-by-day framework used for Plastilite, Technical Glass Products, and dozens of other manufacturers.

NIST MEP Improves On-Time Delivery
ACE Controls Inc., supported by NIST Manufacturing Extension Partnership, used Resource Manager to improve on-time delivery through visual workcenter loading and what-if scenario analysis.

BAE Systems: Eliminating Production Backlogs with RMDB
How BAE Systems Ordnance Systems used Resource Manager DB as an ERP add-on to eliminate production backlogs, reduce outsourcing costs, and gain finite capacity visibility their ERP could not provide.