Resource Manager-DB Innovates Li-ion Battery Production Scheduling
User Solutions Releases RM-DB V6 with Finite Capacity for Supply Chain, original Sub-Assembly Management and a Bills-of-Resources that blends any combination of Materials and Workcenters.
South Lyon, MI 6/9/2016
User Solutions, a premier provider of flexible production scheduling, planning and tracking software systems today announced the release of V6 for the manufacturing sector, resulting from customer demand. RM-DB V6 features Bills-of-Resources that can blend any combination of materials and workcenters; a supply chain management system that includes finite capacity planning and a unique sub-assembly system that provides intricate management of outsourced operations. Addition features include progressive lot traceability, job costing, and data integration.
“Resource Manager-DB product provided a unique combination of planning, scheduling, and tracking functionality within a single, yet flexible system.” – – Scott Bennett, Enevate Corp.
In 2015 Enevate Corporation, creator of the next generation of Li-ion batteries was building out a greenfield manufacturing facility which demanded a unique combination of planning, scheduling, and tracking functionality within a single, yet flexible system. Not only did the proposed system need to add finite capacity scheduling and advanced routings to traditional ERP functionality, such as costed bills-of-materials (BOMs), inventory management, MRP and full lot traceability but also provide a greater level of flexibility.
Supply Chain Manager Empowerment
According to Scott Bennett, Supply Chain Manager for Enevate, “We found that the User Solutions team and the Resource Manager-DB product provided this unique combination we demanded without sacrificing flexibility all at a palatable price point.”
Scott continues, “Due to our implementing brand new, original processes to build our innovative batteries, we required dynamic supply chain reconfiguration capability. We found Resource Manager-DB’s flexible format vital when combining workcenters, products, and sub-assemblies, allowing us to run a wide variety of ‘what-if’ scenarios. Having the option to build models directly in minutes or import different scenarios, plus leveraging Excel to hold the different data sets, made it surprisingly easy.”
Scott summarizes, “Not only is the product inherently flexible to adapt to how we do our business, but also, as a company, User Solutions continually accommodated our particular requests into the core software. From detailed 10 level deep sub-assembly structures, through importing new configurations via Excel, to scheduling workcenters and products in virtually any combination, we keep finding new and beneficial uses for this tool. User Solutions adapted their Lot Management capability, including traceability and pick lists, plus added new inventory valuation by location by lot and even combined Workcenters (scheduling) and Products (costing) attributes into a single entity.”

Affordable and Compatible Production Scheduling
A single user version ranges from $5,000 – $10,000 which includes implementation assistance. Resource Manager-DB runs with Windows and uses Excel for reports.
Resource Manager-DB is the first tool that can be utilized across the full manufacturing spectrum, from small shops with no formal systems in place, all the way to large multi-nationals needing to augment existing ERP systems.
For more information or a free trial, contact www.UserSolutions.com or call 1(800) 321-8737