Excel Applications
Choose the product that best suits your companies needs by using our product matrix.
Call US for custom quotes based on your specific needs.
Production Scheduling Features
|
![]() OPERATIONS MANAGER$39 |
![]() SPREADSHEET QC$39 |
![]() WORKCELL PLANNER$39 |
![]() SPREADSHEET SCHEDULER$39 |
![]() Workcenter for XL$500 |
![]() Resource manager for Excel$1200 |
---|---|---|---|---|---|---|
+ CustomizableWe specialize in enhancing any product, or combination, to meet your unique needs. |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
+ Prototype / Learning Tool TemplatesIdeal for hands-on learning of concept and building your own models with template basics. |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
+ Finite CapacityOnly schedules to what is available. Customizable Workcenter Calendars and Daily Calendar. Color coded. Graphics. |
![]() |
![]() |
![]() |
![]() |
![]() |
|
+ Quality ControlPerfect for learning concepts and building your own includeds 15 Control Charts, P Charts, Sampling Methods, Pareto, more. |
![]() |
![]() |
||||
+ RoutingsWorkcenter Set-up and Cycle Times, Queue / Move Times, Linear and non-Linear. |
![]() |
![]() |
![]() |
![]() |
||
+ Project Management BasicGantt Charts, Task Descriptions, Timing, Tracking, all simplified. |
![]() |
![]() |
![]() |
![]() |
||
+ Tracking Actuals / RecalculatingTemplates include source code and can be modfied directly by user to track actuals and recalculate results. |
![]() |
![]() |
![]() |
|||
+ Bill of MaterialsQuantity per, Parent-child, Sub-Assemblies, Rev Control, much more. |
![]() |
![]() |
||||
+ Mixed Mode SchedulingForward based on start date or Reverse based on due date or even Time Fenced. Per job or group of orders. Prioritize at any level. |
![]() |
![]() |
||||
+ ForecastingPerfect for learning concepts and building your own included exponential, capacity, materials, more. |
![]() |
![]() |
||||
+ Inventory ManagementLow maintenance. Safety Stocks, Yield Factors, Purchasing UOM, ATP, Reporting. |
![]() |
![]() |
||||
+ Material Planning BasicWhat materials are required for what jobs and when. |
![]() |
![]() |
||||
+ Advanced Planning & SchedulingAlternate Routings, Multiple Constraints, Mulitple Priorities, Rescheduling on demand, much more. |
![]() |
![]() |
||||
Call us for custom quotes based on your specific needs. Production Scheduling Features
|
---|
+ Customizable We specialize in enhancing any product, or combination, to meet your unique needs. |
+ Prototype / Learning Tool Templates Ideal for hands-on learning of concept and building your own models with template basics. |
+ Finite Capacity Only schedules to what is available. Customizable Workcenter Calendars and Daily Calendar. Color coded. Graphics. |
+ Quality Control Perfect for learning concepts and building your own includeds 15 Control Charts, P Charts, Sampling Methods, Pareto, more. |
+ Routings Workcenter Set-up and Cycle Times, Queue / Move Times, Linear and non-Linear. |
+ Project Management Basic Gantt Charts, Task Descriptions, Timing, Tracking, all simplified. |
+ Tracking Actuals / Recalculating Templates include source code and can be modfied directly by user to track actuals and recalculate results. |
+ Bill of Materials Quantity per, Parent-child, Sub-Assemblies, Rev Control, much more. |
+ Mixed Mode Scheduling Forward based on start date or Reverse based on due date or even Time Fenced. Per job or group of orders. Prioritize at any level. |
+ Forecasting Perfect for learning concepts and building your own included exponential, capacity, materials, more. |
+ Inventory Management Low maintenance. Safety Stocks, Yield Factors, Purchasing UOM, ATP, Reporting. |
+ Material Planning Basic What materials are required for what jobs and when. |
+ Advanced Planning & Scheduling Alternate Routings, Multiple Constraints, Mulitple Priorities, Rescheduling on demand, much more. |

RESOURCE MANAGER FOR EXCEL
Single User
$5-$39
Five Users
$10-$78
- NO
- NO
- NO
- NO
- NO
- NO
- NO
- NO
- NO
Want to get your production in the groove?
Watch this classic video and get your operations movin’ and groovin’ today!
Production Scheduling Features
| Workcenter Scheduler XL(Excel Add-On) | Resource Manager for Excel(Excel Add-On) | |
---|---|---|---|
Routings Workcenter Set-up and Cycle Times, Queue / Move Times, Linear and non-Linear. | ![]() | ![]() | ![]() |
Finite Capacity Only schedules to what is available. Customizable Workcenter Calendars and Daily Calendar. Color coded. Graphics. | ![]() | ![]() | ![]() |
Tracking Actuals & Rescheduling Import Actuals. if available, or direct entry. Even drag-and-drop to track WIP. | ![]() | ![]() | ![]() |
Bill of Materials Quantity per, Parent-child, Sub-Assemblies, Rev Control, much more. | ![]() | ![]() | |
Mixed Mode Scheduling Forward based on start date or Reverse based on due date or even Time Fenced. Per job or group of orders. Prioritize at any level. | ![]() | ![]() | |
Inventory Management Low maintenance. Safety Stocks, Yield Factors, Purchasing UOM, ATP, Reporting. | ![]() | ![]() | |
Material Planning Basic What materials are required for what jobs and when. | ![]() | ![]() | |
Customizable We specialize in enhancing any product, or combination, to meet your unique needs. | ![]() | ![]() | |
Purchase Orders Easy, fast, accurate. Based on scheduled demand, stock replenishment, and more. Paperless option. | ![]() | ||
Drag and Drop Visually change dates per job, per workcenter, or even drag job from one workcenter to another. | ![]() | ||
Materials Planning Advanced MRP Calculations, Shortage Reports, Lot and Batch Sizing, much more. | ![]() | ||
Integration with other systems Import and Export to Excel and direct importing via ODBC drivers. Integrates easily with most ERP and custom systems. | ![]() | ||
Advanced Planning & Scheduling Alternate Routings, Multiple Constraints, Mulitple Priorities, Rescheduling on demand, much more. | ![]() | ||
Price Range (Single User)Call us for custom quotes based on your specific needs. | $490 | $1200 to $1800 | $4,490 to $9,980 |
Price Range (Five Users)Call us for custom quotes based on your specific needs. | $980 | $2400 to $3600 | $9,980 to $19,960 |