User
Solutions, Inc. Announces
Resource
Manager-DB with ERP Link
South
Lyon , MI: User Solutions, Inc., has announced immediate availability
of Resource Manager-DBTM with ERP Link. For the first time,
Customers who have implemented ERP have a ready-made add-on to immediately
improve their planning, scheduling, and tracking capabilities. Written
in Visual Basic, using Microsoft AccessTM Database and Microsoft
ExcelTM as a flexible report writer, Resource Manager-DB provides
Customers unsurpassed flexibility for leveraging Excel on local
PCs, and sharing data across a network. With a flexible design
to integrate with most all ERP Systems, Resource Manager with ERP
Link has worked with JDEdwardsTM, SAPTM, Real WorldTM, MAS 90TM,
Exact (Macola)TM, PrisimTM. LawsonTM, ManManTM, MapicsTM, and many
more.
Resource
Manager-DB / Link Features
Each ERP Link interface is optimized per customer
request. For example, the Exact / Macola Link features a direct
SQL connection with Macola Progression SeriesTM software and Resource
Manager-DB can read from and write to numerous Macola Modules per
customers specific requirements.
Resource Manager-DB with ERP Link provides the user with the best
of breed approach by adding powerful and flexible manufacturing
planning, scheduling, and tracking features to existing ERP Systems. Users
can leverage their ERP System data combined with familiar Microsoft
OfficeTM to add Routings and Shop Scheduling, “What-If”
analysis plus powerful Finite Capacity Planning and Scheduling. Resource
Manager-DB also supports Just-In-Time and Lean Manufacturing techniques. The
product features on-the-fly configuration and rescheduling, allowing
the user to see the benefits almost immediately, without complicated
analysis or set-ups.
Exact
/ Macola End User: "Cost Effective and Flexible"
Milwaukee Sign Company, located in Grafton, WI,
produces signage for major oil companies, quick service restaurants
and retailers in the U.S. and around the world. According to Thomas
Bohmann, Director, Strategic Projects, "We've been using Macola
for 6 years utilizing Routings, Shop Floor Control & Manufacturing
Cost Accounting. Recently we analyzed our business and concluded
Production Order Processing provides us with all the capabilities
we need while saving us considerable administrative costs &
maintenance fees.
"Our
one reservation during the decision making process was the ability
to schedule work centers according to capacity restraints. This
is when Macola suggested I explore User Solutions' scheduling system
Resource Manager, as a possible link to Production Order Processing
in Macola. User Solutions was very receptive to our ideas and, after
a joint effort in understanding both systems, User Solutions has
customized a link between Macola & Resource Manager to support
our goals for automated integration.
"We are now able to import POP work orders
into Resource Manager for scheduling purposes using Value Added
Cost Types & Product Structure Costs to load the work centers
for capacity planning. Scheduled due dates are updated in Resource
Manager & automatically sent back to Macola to update work order
due dates & sales order required ship dates.
"The capabilities of Resource Manager &
the link to Macola will give us the needed scheduling tool to plan
resources & confirm product ship dates for our customers.
"Resource Manager is a cost effective software tool that goes
well beyond our needs, but has the flexibility where we can utilize
what we need & still maintain the integration of our Macola
modules without duplication of effort. I'm looking forward to a
continuing relation with User Solutions".
Advanced
Planning and Scheduling Included
Resource Manager-DB contains many advanced planning
and scheduling features normally found in systems costing 10 times
more. Resource Manager-DB features: alternate routings, alternate
workcenters, automatic optimization, multiple constraints, and detailed
workcenter calendars that can be adjusted at any time. Now, inevitable
labor fluctuations, workcenter downtime, and unexpected material
shortages can be immediately accounted for, allowing the user to
regenerate a schedule with new priorities - on demand. Real-time
Resource Calendar reports include: Load Utilization, Backlogs, Bottlenecks,
Capacity Pockets and more. In addition, a special Dynamic Reconfiguration
allows the user to easily and quickly reconfigure scheduled Production,
on-the-fly, to reflect reality.
Affordable and Compatible
Available through Exact / Macola Business Partners
or User Solutions, the single user version is $4,900. A 2-5 multi-user
version is $9,800, plus maintenance & Macola Link. Resource
Manager-DB runs with Windows and MS Office 97 or greater for reports.
For more information, or for free trial, contact: www.UserSolutions.com
or call toll free (800) 321-8737.
|
For over 15 years User Solutions, Inc. has been the easy choice for thousands
of companies worldwide.. |
Easy
to try
Free trial software and / or detailed walk through demos, combined with a 30
day money back guarantee, ensures quick implementation and success without any
risk.
Easy
to buy:
All major credit cards, Company PO’s, and checks cheerfully accepted.
Download Links and e-mail for instant delivery. Real people to help with phone
orders plus CDs and printed manuals shipped within a day.

Easy
to use
Familiar, open,
Microsoft Office design requires minimal configuration and upkeep. In addition,
our technical support is the best you will find anywhere. Hear what other users
have to say in our Success Stories section, then Call US to schedule a personalized
web demo of Resource Manager-DB and see for yourself!

|